An airport that had to keep operating
The Terminal F redevelopment began with one clear requirement: the airport had to stay fully operational. Phase one was therefore a temporary departures building, so that the existing terminal could be demolished. Only once operations had moved and demolition was complete could the new three-level building go ahead.
Construction, safety and schedules had to be closely coordinated, to exceptionally high operational standards. The temporary building had to meet the same standards.
Ohm tech delivered the detailed installation design and the building systems works through a dedicated team of project managers, design engineers, technicians, draughts persons and site personnel. The team focused on:
New client requirements emerged during construction, so solutions were adapted as work progressed. Continuous dialogue between the design team, the site team and the client identified alternatives that balanced functionality, efficiency and cost.
Completed in just two and a half months, the temporary building was no side structure. It was the essential precondition for a prestigious and demanding project. The complexity and tight timescales show a core part of Ohm tech’s approach: building technical solutions around the client’s real operational needs while keeping control of schedules and coordination.